Pattullo Bridge Replacement Environmental Assessment: Acoustic Modelling

View Report

March 2018 — British Columbia, Canada

Client: Hatfield Consultants

Appendix 18.18 – Underwater Acoustic Modelling Report

Predictive modelling of underwater noise from pile driving to inform the environmental impact assessment for the construction of a four-lane bridge across the Fraser River to connect the cities of Surrey and New Westminster, British Columbia. Pile driving noise is transmitted from the pipe pile through river sediments and sheet pile wall, and into the water. Sound levels and ranges to acoustic thresholds in water that may result in injury to valued ecosystem components such as fish (e.g. sturgeon and Pacific salmon) were reported.

Previous
Previous

Nexen Energy ULC Flemish Pass Exploration Drilling Project (2018–2028)

Next
Next

Barossa Area Development Offshore Project Proposal