Barossa Area Development Offshore Project Proposal
March 2018 — Northern Territory, Australia
Clients: Jacobs, ConocoPhillips Australia
Appendix E – Underwater noise monitoring survey (90 p)
Appendix N – Underwater noise modelling – Facility anchor piling (59 p)
Appendix O – Underwater noise modelling – Facility operations (43 p)
Acoustic monitoring and modelling studies for Jacobs as part of ConocoPhillips Australia’s Offshore Project Proposal. The 12-month long monitoring study characterized the acoustic environment at and surrounding the Barossa LNG field using three seabed recorders. The two modelling studies predicted underwater sound levels associated with the construction and operation of the proposed FPSO facility and the potential impacts on marine fauna.